SELECTED PROJECT LIST

 

AE&T was retained for geotechnical, environmental, structural, construction monitoring and testing services for construction of new offices, schools, residential subdivisions, golf course/resorts, commercial, manufacturing and warehousing facilities and telecommunication tower sites. Some of the recent projects completed by AE&T are described below:


INDUSTRIAL/WAREHOUSE/COMMERCIAL FACILITIES & TELECOM

SITESChicago Manufacturing Campus Infrastructure / Ford Supplier Park. 2003

AE&T was retained by its client to provide construction quality control and materials testing services comprising soils, concrete, steel welding, roof inspection for infrastructure improvements and construction of five industrial buildings and parking areas at the 155-acre brownfield site located one-half mile from Ford's Chicago assembly plant near the intersection of 126th Street and Torrence on the city's South side. Once complete this 155-acre, 1.7 million square foot park will be home to Ford Motor Companies many automotive suppliers including: Plastech Engineering Co., Sanderson Industries, Summit Polymers, S-Y Systems, Tower Automotive, Visteon Corporation, ZF Lemforder. The pre-cast building floor areas ranged from 215000 SF to 461,000 SF with 30 feet clear height and also comprised parking areas, truck docks with trailer stalls, cranes and gantry cranes.

SPRINT PCS, T-MOBILE, WFI and other Wireless Telecommunication Sites

(IL, IN, WI, OH, PA, NE, IA, MN, KS, MO). 1998 to Present.

AE&T provided construction monitoring, inspection and testing services for more than 300 monopole, lattice and guyed towers. Monitored installation of caisson foundations, mat footing & equipment platform, performed soils and concrete testing for Sprint PCS and T-Mobile, Chicago Market.

Provided full service A&E, Geotechnical, Environmental, Structural, Surveying, Tower Analysis, Rooftop and Foundation Design for monopole, guyed, and self supporting towers for specific loading per TIA/EIA-222-F, and recommended modifications if required.

Medical Center Building, Elgin, IL. ($ 3 million), 1998

Construction Manager/General Contractor for a 20,000 SF two story commercial medical office building construction. Developed the 4 acres vacant raw land for commercial office.

Medical Office Building, Crystal Lake, IL. 1988

Construction Manager (GC) for the construction of a 8000 SF medical office building.

Midway Airport Terminal Development, Chicago, IL. ($650m project), 2000- 02.

AE&T was a sub to Rust-Kenny Joint Venture and provided construction quality control for the 950,000 square foot new terminal building and concourse HVAC system installation.


SCHOOL BUILDINGS & GROUNDS

AE&T provided Construction Monitoring & Material Testing Services for several new school’s building Construction, Addition and Renovation.

School Town of Munster, IN. (Project Cost > $60 million). 1996 – 1999 & 2003.

Munster High School
Wilbur Wright Middle School
Frank Hammond Elementary School
Eads Elementary School
Elliot Elementary School

School City of Hammond, IN. (Project Cost > $500 million). 1998 – Present.

Jefferson High School
Clark High School
Morton High School
Hammond Senior High School
Hammond Gavitt High School
Morton Elementary School
Edison Elementary School
Maywood Elementary School

Construction Monitoring & Testing for schools in Illinois

Beebe Elementary School, Naperville, IL
Jefferson Junior High School, Naperville, IL
Glenbard West High School, Glen Ellyn, IL
Plainfield Elementary School, Sweetwood Subdivision
Fenway Park Elementary School, Orland Park, IL
La Grange Highlands School, La Grange, IL
Lakewood Falls Elementary School, Plainfield IL
Plainfield Elementary School, Caton Farm Road, Joliet, IL
Plainfield Middle School, Brook Road, Joliet, IL
Homer Township School sites, Homer, IL
Shorewood Elementary School. Shorewood, IL
Grisson Junior High School (building addition), Tinley Park, IL
Elementary School at 84th & 179th Street,Tinley Park, IL
Tinley Park Junior High School, Tinley Park, IL
Maerker School, Westmont, IL


COMMERCIAL/OFFICE BUILDINGS (CHICAGO AREA)

Brinks Incorporated Corporate Office, Chicago, Illinois. July – December 2003

AE&T provided soils and material testing services for a new facility for Brinks Incorporated located at 919 S. California Avenue in Chicago, Illinois. The 76,984 square foot facility is situated on a 6.9-acre site within the California Business Center. The ground was dynamically compacted and the pre-cast concrete structure comprised slab on grade construction.

Construction & General Laborer’s District Council of Chicago. 2003-2004

AE&T was retained to provided construction monitoring, soils and materials testing services for the 45,360 square feet of a three-story office building to suit the Council's needs was located in Burr Corporate Park at 999 McClintock in Burr Ridge, Illinois. Work commenced in late September 2003 and was completed in April 2004. The project entailed building-out two 15,120 square foot floors of the structure for office usage. The remaining 15,120 square foot floor will be available for lease. Features include HE Williams Light Fixtures, architectural precast with decorative medallions and a Trane VAV HVAC System. The parking lot can accommodate up to 157 cars.


RESIDENTIAL DEVELOPMENTS ( Chicago suburbs)

AE&T provided construction monitoring and geotechnical engineering services for the following residential subdivisions in Naperville/Aurora/Plainfield/Wheaton/Oak Brook, IL :

Tall Grass, White Eagle, Hobsons Pond, Prairie Crossing, Royce Woods, Ashbury, Creekside, Harmony Grove, Stillwater, High Meadows, Champion Creek, Clearwater, Saddle Creek, Forest Gate, River Run, Blazing Trails, Black Walnut Trails, Stone Haven, Park Place, Nadelhoffer Woods, Gilmore Farm, Fairfield Village, Princeton Estates, Forest Ridge, Wind Ridge, Spring Meadow, Sanctuary, Kinloch, Dayfield, Chelsea, Deerpath, Swanbrook, Heron Creek, Wooded Creek, Seasons Ridge, Orchard Valley, Nature’s Edge, Chicory Place, Indian Trail Estates, Rose Hill, 20th Century Homes (First Country Homes) .

Sand Creek Development, Chesterton, IN. ($500 million) 1996 - Present

AE&T provided QA/QC, soils, materials testing and construction monitoring for phase IV and V of the 600 acres championship golf course residential land development project.

Designed a 2 span, 4 lane concrete Wabash road bridge superstructure and foundation over Coffee Creek at Sand Creek Development and provided foundation inspection and construction monitoring.

AE&T developed an in-house GIS software package for Sand Creek Development which included custom queries/report, polygon overlays, data preparation, digitization and conversion for topographic maps, street and utility layout including house-lot plan using ESRI Arc Info and Arc View packages.

Lake Erie Land Company, Chesterton, IN. 1997- Present

Construction Inspection, Soils & Materials Consultant for the 600 acres Coffee Creek Center commercial development in Chesterton, IN. Provided geotechnical report, construction monitoring and material testing services for construction of the Hilton Garden Inn.

Structural design for several pedestrian bridges, Pavilion at Coffee Creek Center and structural design for Voyage Boulevard Tunnel (Conspan).


CIVIL / STRUCTURAL / HYDRAULIC DESIGN

Sanitary Landfill Construction Monitoring 2001 – Present.

QA/QC, Laboratory Testing & Closure Certification.

Provided field engineering including earthwork construction monitoring, field soil density tests, permeability tests, HDPE and clay liner placement monitoring, gas and leechate collection systems and final closure certification and laboratory testing services for several county landfill projects in Illinois.

River Hydrology & Hydraulic Studies

Performed hydrology and hydraulic studies for several county highway bridges and culverts in Nebraska.

Permitting and hydraulic Studies for Salt Creek Flood Plain for a cellular tower site in Palatine, IL.

Design of Industrial Buildings ( 2000-02 )

Provided complete architectural & engineering (A&E) design packages for three industrial buildings 19,000 SF, 25,000 SF and 50,000 SF each for Bearden Management at Omaha, NE.

Pre-stressed Concrete Bridge Design ( 2000 )

Designed two pre-stressed concrete bridges and also performed hydrology and hydraulic studies for Hall County Department of Road, Nebraska (2000)

Pre-stressed Concrete Girder Bridge Design ( 2001-02 )

Designed a three span pre-stressed concrete girder bridge and also performed hydrology and hydraulic studies for Thurston County Department of Roads, Nebraska.


NEW RESIDENTIAL DEVELOPMENTS / PROJECTS under progress ( 2004 )

Geotechnical Investigation, construction monitoring and testing services for :

225 acres Foxborough Estates, Mokena, IL
150 acrs Ashwood Park North, Naperville, IL
50 acres English Rows Townhome Development, Naperville, IL
Network Technology Center Building, Cingular Wireless, Schaumburg, IL.
600 Acres LaValle Greens Development & Golf Resort, Marina & De-Salination Plant – Soil Investigation & Hydraulic study. St. Kitts Island, West Indies.